| Restock Supply of D-50 at Welby |
| Replenish D-50 Rock from Pelican Point to Welby |
|
Flood Control crews used the D-50 rock from Welby Pit to repair the creek and perform bank restoration work. The damage was from the 2011 flood water. The location of the damage is 7150 So 1050 E. Restock flood control stockpile. |
||
| When: | January 01, 2012 through May 01, 2012 From 06:00 AM to 10:00 PM | |
| Location: | Welby Pit - Crushing of Concrete | |
| Address: | 9500 S 5200 W - Welby Pit | |
| Cost: | n/a | |
|
Contact: |
Rich Judson rjudson@slco.org 801-468-2711 |
|