xxx

Find by Topic

Infrastructure - Sidewalks

Flood Control Engineering

Planning, engineering design, and construction of County roads, highways, bridges, curbs, gutters, sidewalks, drainage, and flood...

Road Construction

The construction and pipe crew is responsible for A.D.A. ramps and waterways, drainage systems and installation of curb, gutter, waterways...

Safer Sidewalk

Older areas of Salt Lake County were not required to install sidewalks at the time of development. This has created a need for installation of sidewalks...

Snow and Ice Control

Snow removal information.